Retrofit coordination —
sequencing, evidence, and delivery assurance.

We coordinate interfaces, gateway checkpoints, and evidence readiness across delivery teams—reducing rework, avoiding scope drift, and improving audit-ready handover.

  • Gateway-based checkpoints & reporting cadence
  • Interface & sequencing control (multi-measure)
  • Risk and actions register with owners
  • Evidence readiness checks before handover

Need assessment support first? View assessment service

Operational Assurance

Retrofit Coordination is the "air traffic control" for your programme. We manage the tricky sequencing between trades, ensure evidence is captured *during* works (not chased after), and maintain a strict governance rhythm.

Sequencing
Control
Governance
Rhythm
Evidence
Discipline

Best for programmes with:

  • Multi-measure packages (Fabric + Heat Pump)
  • Occupied delivery (Access & Resident constraints)
  • Higher-risk fabric (Moisture sensitive)
  • Recurring evidence failure history
Note: We provide coordination and assurance; delivery remains with your appointed contractors.

Coordination Tiers

Select the level of assurance that matches your risk profile.

Tier 1

Light Touch

For stable teams & lower-risk scopes.

  • Agreed checkpoints
  • Evidence sampling
  • Escalation support
Tier 2 (Recommended)

Programme Cadence

For multi-site & multiple teams.

  • Regular gateway checks
  • Actions register mgmt
  • Formal reporting rhythm
Tier 3

Full Assurance

For high-risk occupied/multi-measure.

  • Interface management
  • Change control
  • 100% Evidence QA

Core Management Areas

Where we focus our effort to reduce your risk.

Programme & Sequencing

Preventing clashes and re-work.

  • Work order logic checks
  • Dependency management

Interfaces & Buildability

Closing the gaps between trades.

  • Junction detailing checks
  • Trade handover points

Risk Management

Proactive issue tracking.

  • Actions register with owners
  • Early warning system

Change Control

Avoiding scope drift.

  • Variations logging
  • Impact assessment

Evidence Readiness

Ensuring the pack passes audit first time.

  • Photo standards compliance
  • Gap analysis pre-handover
  • Commissioning doc checks
  • Sign-off consistency

Boundaries & Ownership

Clear separation of duties for contractual safety.

ActivityClientContractorRetrofit Green
MobilisationBriefProgrammeScope & Interface Confirm
Site Works--H&S / Labour / BuildCheckpoints & QA
EvidenceAuditCapture & UploadReadiness Check & Gap Log
HandoverSign-offPack SubmissionCompliance Recommendation
* Final contractual responsibility remains with the appointed delivery partner.

Attendance Cadence

Mobilisation
Gateway 1
Gateway 2
Pre-Handover
Close-out
Attendance Model: Site attendance agreed per programme (gateway-based), with remote checks between.

Deliverables

Governance Pack

Coordination plan, checkpoint schedule, reporting rhythm.

Control Registers

Risks & actions (owners/dates), decisions log, variations notes.

Evidence & Handover

Readiness checks, gap list, close-out status.

Risk Register
Evidence Check

Procurement FAQs

Enquire about Coordination

What happens next?

1

We respond with a proposed coordination model and cadence.

2

We confirm interfaces, outputs, and mobilisation inputs.

3

If needed, we align to your templates and governance rhythm.